中文

ChemCheck · Global Regulations & Standards Database

Popular Searches:
In force
Notice
NDRC, Energy Dept., Notice [2026] No.942

Plan for the Development of the New-Type Power System during the 15th Five-Year Plan Period

Issuing AuthorityNational Development and Reform Commission of the People's Republic of China,National Energy Administration of the People's Republic of China
Release date 2026-08-03
Effective Date2026-08-03
Level Notice
IndustryProduction and Supply of Electric Power and Heat Power; daily-use machinery
Field Carbon Peak & Carbon Neutrality

Abstract

The Plan applies to entities involved in power planning, construction, operation and regulation nationwide, coordinating the development of renewable energy, hydropower, nuclear power, coal-fired power, energy storage, power grids, charging infrastructure and electricity markets. By 2030, it calls for increasing the shares of non-fossil power generation and installed capacity; advancing region-specific renewable-energy consumption, direct green-power connections, zero-carbon industrial parks and energy-saving and carbon-reduction retrofits of coal-fired power; building coordinated transmission, distribution and microgrids; enhancing interprovincial mutual support, storage-based peak supply, demand response and vehicle-grid interaction; improving power safety, emergency response, construction quality and grid-connection safety management; promoting artificial intelligence, standardization, and integration of power with computing, transport, heat and hydrogen; and strengthening the national unified electricity market and regulatory mechanisms.
Document Preview

Log in to access regulatory content, document previews, update history, and more.